Support that lasts as long as the system
Commissioning, operator training, preventive maintenance and spare parts for the systems we build and the equipment we supply.
A system is only finished when the people who run it are confident with it. Every project ends with testing, commissioning and hands-on training, and many continue with a maintenance agreement.
Our service centre in Ashmoun, Menoufia handles water meters, measurement and control instruments and leak-detection equipment.
What we deliver
Commissioning
Performance tests, settings and handover documents.
Operator training
On-site training for operators and engineers, in Arabic.
Preventive maintenance
Scheduled visits for pumps, filters, solar arrays and instruments.
Repairs & calibration
Service centre for meters, instruments and leak-detection equipment.
Spare parts
Parts for the pumps, meters and drives we supply.
Remote monitoring
Telemetry that warns of faults before they stop the system.
Selected references
See our projects- FAO — Assiut & SohagCommissioning and operator training for farmer groups.
- Water utilitiesMaintenance of flow meters and SCADA.
Related products
Flow meters
Electromagnetic and ultrasonic flow meters, with PLC and SCADA integration.
Learn moreGutermannLeak detection
Acoustic loggers, correlators and listening devices to find and reduce water losses.
Learn moreC.R.I.Pumps
Split case, end suction, deep well and sewage submersible pumps — with local assembly in Egypt.
Learn moreFrequently asked questions
Do you maintain equipment you did not supply?
Often yes, for the brands we represent. Contact us with the make and model.
Where is your service centre?
In Ashmoun, Menoufia, with our head office in New Cairo.
Supplying projects in Egypt and across Africa
We export this range from Egypt to projects throughout Africa — Sudan, Libya, Chad, Kenya, Ethiopia, Senegal, Côte d’Ivoire, Nigeria and beyond — with selection support, export documents and after-sales service.
Export to AfricaPlanning a project like this?
Send us your site location, water source and power supply. Our engineers reply within two working days.